Troy Lee Designs Flowline Helmet w/ MIPS Orbit
| Availability: | In stock (1) |
DETAILS
The all-new Flowline Helmet is hand-picked, literally, by the pros and for good reason. The Flowline Helmet features a combination of comfort, safety and signature TLD style. It's NTA-8776 certified, making it the perfect choice for any rider looking to hit their local trails or cruise the streets on their e-bikes.
FEATURES
- 3-Way adjustable screwless visor
- NTA-8776 certified for E-Bike usage
- MIPS B-Series Rotational Impact Brain Protection System
- Full 360-degree fit retention system with 3-way rear height adjustment
- 14 vents for maximum airflow
- Full wrap in-mold construction
- Extended Coverage MTB Trail Helmet
- Side strap adjusters
- 5-Star Virginia Tech safety rating
HOW TO FIT
MEASURE YOUR HEAD
With a fabric tape measure around the circumference of your head holding the tape just above your eyebrows and ears. 1” = 25mm

